Instructions for Final Project Report
Zahteve zaključka
General Guidelines
- Length: The report should be concise and not exceed 15 pages, with a typical length of 10 pages, excluding appendices.
- Formatting:
- Use a standard font such as Arial or Times New Roman, size 11–12 for body text.
- Include a title page with the project title, authors, course title, and date.
- Number all pages.
- Include a table of contents with accurate page references.
- Language: Use professional and formal technical language. Proofread for grammar and spelling errors.
Structure and Content
-
Cover Page
- Project title.
- Names of authors.
- Course title and year.
- Date of submission.
-
Abstract (Optional but Recommended)
- Provide a brief summary (150–200 words) of the project, including objectives, key features, and outcomes.
-
Table of Contents
- List all sections and subsections with their corresponding page numbers.
-
Introduction
- Overview of the project.
- Problem statement and motivation.
- Objectives and scope of the project.
-
Project Description
- 5.1 Description of the Task:
- Define the purpose and goals of the system.
- Summarize the project requirements and specifications.
- 5.2 Overview of the System:
- Provide a high-level description of the system, including components and their roles.
- Include diagrams if needed for clarity.
- 5.3 Process Description:
- Describe the operational process or production workflow in detail.
- Highlight both automated and manual interactions.
- 5.1 Description of the Task:
-
Control System Design and Implementation
- 6.1 Control Hardware:
- Outline the hardware components used (e.g., PLCs, sensors, actuators).
- 6.2 Control Software:
- Detail the programming environment and techniques.
- Explain how manual and automatic modes were implemented.
- 6.3 SCADA Integration (if applicable):
- Overview of SCADA features, such as monitoring, control, and alarms.
- Include screenshots or illustrations of the SCADA interface.
- 6.4 Implementation Steps:
- Summarize the key stages of the control system's development and testing.
- 6.1 Control Hardware:
-
Instructions for Use
- 7.1 System Startup and Shutdown:
- Step-by-step guide for turning the system on/off safely.
- 7.2 Manual Mode:
- Instructions for manually operating the system.
- 7.3 Automatic Mode:
- Explanation of automated processes, including transition triggers.
- 7.4 Alarms and Troubleshooting:
- Description of alarm types (e.g., informational, warnings, critical).
- Steps to diagnose and resolve common issues.
- 7.1 System Startup and Shutdown:
-
Implementation Challenges and Solutions
- Describe the main difficulties encountered during the project implementation.
- Detail how these challenges were addressed, including:
- Technical problems and their solutions.
- Insights gained from debugging and testing.
- Improvements made to initial designs.
- Highlight lessons learned and their relevance to future projects.
-
Conclusion
- Recap the project objectives, challenges, and overall results.
-
References
- List all sources in a standard citation format (e.g., APA, IEEE).
-
Appendices (if necessary)
- Include supplementary materials, such as:
- System diagrams.
- Code excerpts.
- Extended test data or results.
- Include supplementary materials, such as:
Additional Notes
- Diagrams and Figures:
- Use diagrams where applicable, ensuring they are labeled and referenced in the text.
- Roles and Contributions:
- If a team effort, include a section or subsection attributing contributions to each member.
- Plagiarism:
- Ensure the report is original and properly cite all external resources.
Zadnja sprememba: ponedeljek, 13. januar 2025, 10.56